Renovation prices in Poland – 2026
Indicative ranges per m² and per point. Use them for a first budget, then compare with crew quotes.
Preparation and demolition
- Removing old tilesPLN 70 – PLN 100 / m²
Walls and ceilings
- Painting walls and ceilings (labour)PLN 20 – PLN 40 / m²
- Gypsum skim coat (service)PLN 40 – PLN 50 / m²
- Interior plastering (turnkey, with material)PLN 120 – PLN 140 / m²
Floors
- Water underfloor heating, pipe onlyPLN 20 – PLN 35 / m²
- Water underfloor heating, complete systemPLN 120 – PLN 260 / m²
- Laying tiles (labour)PLN 100 – PLN 200 / m²
- Tile materials and chemicals (adhesive, grout, primer)PLN 80 – PLN 150 / m²
- Self-levelling screed (turnkey)PLN 100 – PLN 120 / m²
- Fitting laminate flooring (labour only)PLN 75 – PLN 85 / m²
- Parquet (labour)PLN 90 – PLN 200 / m²
Installations
- New plumbing point (with material)PLN 350 – PLN 500 / point
- New electrical pointPLN 160 – PLN 200 / point
- Replacing or moving a plumbing pointPLN 800 – PLN 1,000 / point
Bathroom and kitchen
- Installing a WC with framePLN 350 – PLN 800 / item
- Installing a washbasinPLN 150 – PLN 450 / item
- Installing a shower enclosurePLN 1,100 – PLN 1,300 / item
- Installing a WC or washbasinPLN 350 – PLN 450 / item
- Installing a bathtubPLN 550 – PLN 650 / item
- Installing a kitchen sinkPLN 600 – PLN 700 / item
- Ready-made kitchen units (set)PLN 3,000 – PLN 5,000 / item
- Made-to-measure kitchen furniturePLN 3,500 – PLN 5,000 / lin. m
Total renovation cost
- Bathroom renovation (mid-range)PLN 3,000 – PLN 5,500 / m²
- Flat refresh (painting, floors)PLN 500 – PLN 900 / m²
- Finishing a developer-standard flatPLN 1,100 – PLN 2,000 / m²
- Full renovation (installations, bathroom, kitchen)PLN 2,800 – PLN 3,900 / m²
Updated: 18/11/2026. Calculator results and prices are estimates only. Check the manufacturer's data sheet before buying materials and ask a contractor for a quote.
Estimate your own flat's renovation cost
Open the cost calculatorFrequently asked questions
Do prices include materials?
Rates for single jobs (painting, tiling) are usually labour only. Lines marked turnkey and the whole-renovation cost include materials.
Are these net or gross prices?
We use gross prices at the usual 8% VAT for residential renovation. Always ask the contractor which rate applies and whether their quote is net or gross.
How often are prices updated?
We review ranges every quarter from published market comparisons. The last change date is under the table.
Why are the ranges so wide?
Price depends on city, condition, crew availability and standard. Treat them as a reference to compare with contractor quotes.